Grey structure to luxury finish, per covered foot
Construction Cost Estimator
Estimates on covered area, not plot area — the mistake that makes most quick estimates 40% too low. Choose a finish tier to get a realistic band.
Estimated construction cost
Covered area
Plot area
Cost per covered foot
Per COVERED square foot, not per plot foot. Quotes priced on plot area are the most common way these estimates come out 40% low.
Excludes the plot, boundary wall, approval and utility connection fees, architect and structural fees, and any basement — a basement typically adds 15–25% on its own.
Why we quote a band
Two contractors working from identical drawings in the same city routinely quote 30% apart, and cement and steel prices here have moved sharply within single years. Anyone giving you one precise number for a build that has not been tendered is guessing with more confidence than the information supports.
Use this to sanity-check a quote you have been given, not to set a budget. A quote materially below the low end of this band usually means something has been left out of the scope — find out what before you sign.
Indicative only. These figures are estimates based on the assumptions you entered — they are not financial advice, not an offer, and not a quotation. Rates, taxes and construction costs change; we confirm every number in writing before you commit to anything.