Grey structure to key handover, on a fixed stage-wise schedule.

Construction Contracts (Turnkey)

Turnkey residential and commercial construction — architectural drawings, approvals, grey structure, finishes and handover, on a stage-wise payment schedule.

The problem

Cost overruns and abandoned sites are the two things every plot owner in Pakistan fears, and both usually trace to the same cause: a verbal rate, no written specification, and payments running ahead of progress.

How we do it

A written specification down to the brand of fittings, a fixed per-square-foot rate by finish tier, and payments released against verified stage completion — never ahead of it.

The process

  1. 1

    Site & feasibility

    Plot survey, soil check, byelaw and covered-area limits.

  2. 2

    Design & approval

    Architectural drawings and building-plan approval from the relevant authority.

  3. 3

    Specification & rate

    Written material specification and a fixed rate per square foot by tier.

  4. 4

    Grey structure

    Foundation, structure, brickwork, roof slabs.

  5. 5

    Services

    Electrical, plumbing, HVAC rough-in.

  6. 6

    Finishes

    Flooring, joinery, paint, fixtures, fittings.

  7. 7

    Handover

    Snagging list, completion certificate, keys.

What you get

  • Architectural and structural drawings
  • Building-plan approval from the authority
  • Written material specification
  • Fixed rate card with a stage-wise payment schedule
  • Site supervision and progress photography
  • Snagging and completion handover

Pricing shown is indicative. We quote per project after a site visit.